昆山免费国产精品视频在线塑膠模具(jù)有限公(gōng)司(sī)

Service phones:13962423309

Contact us

Bai Shui Chao           

Email: dl-bsc@dlsjmj.com 

Telephones:  13962423309 


Mark Yen              
Email: dl-mark@dlsjmj.com 
Telephones:  17312472090 


TEL:0512-57170368

FAX:0512-57170328

HTTP://www.dstzpx.com

Add: No.218 South Yucheng  Road Kunshan City Jiangsu Province China.


Industry news locations:Index  >  News  >  Industry news

Specification for installation and adjustment of injection moulds

Release date:2018-09-19 Click number:8168

This article analyzes the installation and adjustment of injection moulds. Let's take a look at it.

First, mold pre inspection:

Inspection should be carried out before the injection molding machine is installed on the mold, so as to find out the quality problems in time, and repair the mold to avoid disassembling after the machine is installed. When the mold fixed template and moving template are separately inspected, attention should be paid to the direction mark, so as to avoid making mistakes when closing the mold.

Two. Installation of oblique guide die:

When installing the mold, the two people should closely cooperate and pay attention to safety. If there is a lateral parting mechanism of the mold, the slider should be installed in the horizontal position, that is, the movable block is moved left and right.

Three. Die fastening:

When the positioning ring of the mold is loaded into the positioning ring seat of the upper template of the injection molding machine, the mold is gently pressed by the moving template at a very slow speed, and then the plate is tightened up, and the gasket must be installed on the pressing plate. The plate must be loaded up and down with four pieces, and when the plate is tightened up, the height of the adjusting screw must be adjusted to the same height as the foot. That is to say, the pressing plate should be flat. If the clamping plate is inclined, the die foot of the die can not be pressed very tightly. The side of the pressing plate must not be near the mold so as not to cause friction to damage the mold.

Four. The ejection distance of the positive ejector pin is:

The position of the ejector should be adjusted to a clearance of not less than 5mm between the ejector plate on the mould and the bottom plate of the mould to prevent damage to the mould and to eject the parts.

Five. Adjusting the tightness of closed die:

In order to prevent overflow and ensure proper exhaust of cavity, when adjusting the hydraulic injection plug-elbow clamping mechanism, it mainly relies on visual observation and experience, that is, when the die is closed, the elbow joint is fast first and then slow, that is, it is not very natural and not too reluctant to straighten out, and the tight degree of the closed die is just right. For moulds requiring mold temperature, the tightness of the die should be calibrate after the mold temperature is raised.

Six, receive cooling water:

After connecting the cooling water, check whether it is smooth and leaking.

Message

昆山免费国产精品视频在线塑膠模具有限公(gōng)司

13962423309

免费国产精品视频在线_日本熟妇乱妇熟色A片在线观看_国产午夜永久福利视频在线观看_曰本熟妇乱妇色A片在线_人妻满熟妇AV无码区国产_99久久国产露脸人妻精品_99久久人妻无码精品系列性欧美_国产精品麻豆人妻精品A片_亚洲精品久久一区二区三区四区_国产精品色欲AV亚洲三区岳